Compute separate D measures for two IATs that work with "include" file


Author
Message
Dave
Dave
Supreme Being (1M reputation)Supreme Being (1M reputation)Supreme Being (1M reputation)Supreme Being (1M reputation)Supreme Being (1M reputation)Supreme Being (1M reputation)Supreme Being (1M reputation)Supreme Being (1M reputation)Supreme Being (1M reputation)
Group: Administrators
Posts: 13K, Visits: 104K

Working fine for me. I recommend removing and re-installing the web control as per https://www.millisecond.com/support/uninstalljava.aspx.


Sanneve
Sanneve
Associate Member (185 reputation)Associate Member (185 reputation)Associate Member (185 reputation)Associate Member (185 reputation)Associate Member (185 reputation)Associate Member (185 reputation)Associate Member (185 reputation)Associate Member (185 reputation)Associate Member (185 reputation)
Group: Forum Members
Posts: 1, Visits: 13
Hi!

I'm also combining two IATs in one experiment. I was wondering if it is possible to show an overall D-score of IAT1 and an overall D-score of IAT2 in the summarydata file?

Thanks in advance.

Regards,
Sanne

Dave
Dave
Supreme Being (1M reputation)Supreme Being (1M reputation)Supreme Being (1M reputation)Supreme Being (1M reputation)Supreme Being (1M reputation)Supreme Being (1M reputation)Supreme Being (1M reputation)Supreme Being (1M reputation)Supreme Being (1M reputation)
Group: Administrators
Posts: 13K, Visits: 104K
Yes. At the end of IAT #1 store the D-score in a separate <values> entry. Do the same at the end of IAT #2. Log both values to the summary data file.

GO

Merge Selected

Merge into selected topic...



Merge into merge target...



Merge into a specific topic ID...




Reading This Topic

Explore
Messages
Mentions
Search